Circuit plan
A room-by-room layout of outlets, switches, lighting and appliance circuits, agreed with you before any wire is pulled.
Permits pulled and inspections booked on every install · (000) 000-0000
Electrical Remodels
Kitchens, bathrooms and additions wired to plan, coordinated with your builder and inspected before the drywall goes up.
Plan the remodel wiring — (000) 000-0000
A remodel is the cheapest moment to get the wiring right. Once the walls are open, adding a circuit for an induction range, moving a switch or running power to an island costs a fraction of what it would after the drywall is finished.
Electrician Hunts Point plans the electrical side of kitchens, bathrooms, basements and additions with you and your contractor. We count the new loads, check whether the panel can carry them and lay out every outlet, switch and light before rough-in starts. Homeowners on the Points usually call us at the design stage, which gives us time to flag capacity issues before they hold up the schedule.
From the first circuit plan to the final cover plate.
A room-by-room layout of outlets, switches, lighting and appliance circuits, agreed with you before any wire is pulled.
We add the new appliances to your existing loads and confirm the panel and service can support them.
Dedicated circuits for ranges, ovens, dishwashers, disposals and microwaves, each sized to the equipment you have chosen.
Ground-fault protected receptacles, fan and heater circuits, and vanity lighting placed where it is actually useful.
Receptacles placed where the code expects them and where you will actually plug things in.
Boxes, cable and connections installed while walls are open, then inspected before insulation and drywall.
We schedule around framers, plumbers and drywallers so nobody waits on the electrical work.
Devices and fixtures installed after paint, every circuit tested and named in your panel directory.
We review your plans or walk the space with you, note every new load and check the panel. You get a written scope that separates rough-in from finish work.
Once framing is ready we install boxes and cable, then call for the rough-in inspection. Walls close only after it passes.
After paint, we set devices and fixtures, test each circuit and book the final inspection. We walk you through the panel changes before we leave.
Finding out the panel is short after the cabinets arrive is expensive. We check it on day one.
Rough-in happens when framing is ready, and inspections are booked ahead so the drywaller is not left waiting.
The circuit plan is written down, so you, your designer and your contractor are all working from the same page.
Call while the plans are still on paper. A free visit now can save a change order later.
Talk through your remodel — (000) 000-0000